DATA REALISASI PBB DUSUN LIMA PEKON SILIWANGI
DATA REALISASI PBB PERTAHUN 2024
| KODE | (RT) | TARGET | REALISASI | KEKURANGAN | ( % ) | Detail |
|---|---|---|---|---|---|---|
| xx.05.10 | RT 10 | Rp. 5.000.000 | Rp. 3.700.000 | Rp. 1.300.000 | % | Detail |
| xx.05.11 | RT 11 | Rp. 7.000.000 | Rp. 5.200.000 | Rp. 1.800.000 | % | Detail |
| xx.05.12 | RT 12 | Rp. 8.000.000 | Rp. 5.800.000 | Rp. 2.200.000 | % | Detail |